New homes, including affordable homes
The masterplan will sustainably deliver up to 3,600 homes for Dorset. This will include a range of property sizes, available for affordable purchase and rent, along with private homes.
The North Dorchester Garden Community is the greatest, single opportunity in Dorset to build affordable homes for social rent (where the rent is calculated in line with local incomes), affordable rent (which is 20% less than the going rental rate), shared ownership and discounted housing for purchase by those with a local connection.
The new homes will be highly energy efficient, utilising renewable energy for heat and power, reducing carbon emissions and household energy costs.
They will also be designed for life, which means they are adaptable to enable older people to stay living independently for longer.
All homes will be of a high quality and designed to complement the local architecture of Dorchester.
Travel and transport
A new link road will connect the A37 and A35 to the north of Dorchester, bypassing the Stinsford roundabout and helping to reduce traffic on the southern bypass and High Street.
New pedestrian and cycle links will mean the centre of Dorchester is just a few minutes away. Existing bus routes will be upgraded to serve the new development.
Currently, many people travel into Dorchester for work. New homes will help to correct this imbalance, as people will be able to live where they work.
Frome Valley Country Park
The focal point of the North Dorchester Garden Community is a 200-acre country park and nature reserve, centred around the water meadows. Opening up the Frome Valley as a new country park will allow people to access and experience the water meadows.
The water meadows will not be developed upon. Nor will there be any building within the flood plain. There will be significant investment in the water meadows to enhance biodiversity and restore their function.
The new country park will be almost seven times bigger than the Great Field at Poundbury. It will offer a major recreational space in the heart of Dorchester and a new gathering place for community enjoyment.
A network of accessible pathways or boardwalks for walkers, cyclists, wheelchairs, pushchairs and mobility scooters will be created through the water meadows with benches for picnics. A new park next to the water meadows will provide open space to throw and kick a ball around, as well as play equipment for children and new sports pitches for community use.
Nature reserves will protect the more sensitive wetland habitats for wildlife and a new sustainable urban drainage system will help manage water levels.
Employment
A new business/employment park will offer modern workspaces for new and existing businesses, generating local job opportunities and attracting economic investment in the area.
Furthermore, many hundreds of jobs will be created through the construction of the infrastructure, homes and other services. Once built, the new schools, leisure facilities, health services and shops will also provide many new roles. The ambition is to create one new job for every house constructed.
Education
A new education campus, catering for first, middle and upper school students, will help reduce overcrowding in existing schools.
Facilities
Dorchester has an ageing population and there is significant pressure on existing local health services. A new medical centre will be created at the North Dorchester Garden Community.
Connecting to the Hardy Trail
A new visitor centre could showcase the history of the Frome Valley and become a focal point for local walking and cycling trails, bringing the water meadows into the Hardy Trail and linking up with Charminster so the Hardy connections can be fully appreciated. A new visitor centre could also include café facilities in the heart of the new country park.
Ecological enhancements
Mandatory Biodiversity Net Gain ensures that any new development improves the environment, leaving nature better off than before.
When a new development is planned, experts first look at the existing plants, animals and habitats. Consideration is then given to how construction will affect the local wildlife and environment. Developers are legally obliged to minimise the negative impact, take steps to protect existing nature as much as possible, and seek ways to improve biodiversity, such as planting more trees, improving waterways or establishing spaces that support wildlife.
In essence, this approach balances development with nature conservation, making sure that new projects help the environment rather than just take away from it. This approach aims to create a win-win situation where both human needs and nature are considered and respected.
Water
The system of checks and balances in place for development of this scale means that we will not compromise the quality of local drinking water. Our infrastructure experts are working with Wessex Water and the Environment Agency to carefully plan the drainage system and these technical discussions will continue throughout the duration of the project, from planning through to implementation.
